When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
Vertical cedar siding installation.
On center table 4.
Check your local code to verify requirements.
Do not nail through overlaps.
Yes we re aware that cedar is also a wood but it is in such demand that it deserves its own section.
Furring strips must be thick.
Installing cedar siding planks requires at least three workers.
Ensure joints meet on studs blocking or furring strips with the nail penetrating solid wood at least 1 1 4 inches.
This is particularly important for vertical installation.
For siding up to 6 inches wide use one nail one inch up from the lap.
Use an air nailer if possible to speed nailing and minimize damage to siding surface from hammer dents.
If your home has cedar shakes and shingles you re going to create an exceptional look with vertical cedar siding.
Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried.
Here are some key tips to a successful cedar siding installation.
Vertical siding applied to stud walls with or without sheathing requires horizontal nailers blocking or other wood framing members spaced not exceeding 24 in.
Masonry walls masonry walls require furring strips for horizontal and vertical siding installation.
It s fairly easy to install which will cut back on your labor costs and it is resistant to cupping and cracking.
This allows for a space between the wood and the structure.
For horizontal applications start with the bottom course and work up with the channels pointing upwards.